Bathroom demolition and removal coordination
High-use rooms are sequenced carefully around services, finishes and access.
Careful bathroom upgrades with clean tiling, plumbing coordination, finishing and handover preparation.
Bathroom renovation is one of the most sensitive parts of any property upgrade. Poor waterproofing coordination, rushed tiling or careless plumbing can create expensive problems after handover.
Bathroom demolition and removal coordination, Plumbing and drainage coordination, Waterproofing preparation and specialist coordination where required, Wall and floor tiling, Ceiling, lighting and ventilation coordination, Vanity, mirror and accessory installation support.
High-use rooms are sequenced carefully around services, finishes and access.
Technical touchpoints are reviewed early and coordinated within scope.
Planned within the confirmed scope with clear sequencing and final checks.
Substrate checks, alignment, edges and transitions handled with care.
Lines, levels and finish preparation are coordinated before final detailing.
Planned within the confirmed scope with clear sequencing and final checks.
Short, clear steps keep the project controlled: scope first, then site review, quotation and coordinated execution.
Photos, area, access and desired finish.
Condition, risks and trade coordination.
Written scope and pricing structure.
Execution, snagging and final checks.
Three practical answers before the first site visit.
Duration depends on size, demolition, plumbing changes, waterproofing, tile availability and fixture installation. A simple upgrade is faster than a full bathroom rebuild.
Yes, if the existing plumbing layout is acceptable and the scope is limited to finishing upgrades.
Materials can be supplied by the client or arranged through agreed vendors depending on the project and quotation.
Send photos, drawings or a basic scope on WhatsApp and Kanat will guide the next step.
WhatsApp +971 52 852 0678